Description
This is a system upgrade to a 2 inch Scalable Ground Array Mount for a photovoltaic system. In addition to this upgrade, you’ll also need Schedule 40 steel pipe.
Additional Features
- Required pipe: 2” ASTM A53 Grade B Schedule 40 Pipe, galvanized to a min of ASTM A653 G90 or ASTM A123 G35, or 2” Allied Mechanical Tubing with Gatorshield or FlowCoat Zinc coating (ASTM A1057).